Mechanical Engineer – Data Centre Construction

Agensi Pekerjaan MRG People Asia Sdn Bhd
Company Registration No. 201901039593 (1348923-A),
Recruitment License No: JTKSM 1261

Job Title: Mechanical Engineer – Data Centre Construction
Location: Kuala Lumpur
Industry: Construction – Data Centre
Reporting To: MEP Manager / Project Manager

 

About the Role:

We are seeking a highly motivated Mechanical Engineer to join our team on cutting-edge Data Centre construction projects. As part of the Main Contractor’s site team, you will play a key role in managing mechanical works, ensuring timely delivery, quality standards, and compliance with safety and regulatory requirements.

 

Key Responsibilities:

  • Coordinate and supervise all mechanical engineering works including HVAC, chilled water systems, fire protection, and plumbing systems.
  • Review and interpret mechanical drawings, specifications, and technical submittals.
  • Work closely with design consultants, subcontractors, and vendors to ensure alignment with project requirements.
  • Monitor and report on project progress, identify risks, and recommend corrective actions.
  • Conduct inspections and testing of mechanical installations to ensure compliance with design and quality standards.
  • Support commissioning and handover processes including preparation of documentation and as-built drawings.
  • Ensure adherence to safety standards and implement site safety protocols.

 

Requirements:

  • Bachelor’s Degree in Mechanical Engineering or a related field.
  • Minimum 3–5 years of experience in mechanical engineering, with at least 1-2 years in Data Centre or high-tech building projects.
  • Experience working with a Main Contractor is preferred.
  • Familiarity with international codes and standards (ASHRAE, SMACNA, NFPA, etc.).
  • Strong communication, coordination, and problem-solving skills.
  • Proficient in MS Office and project management tools; familiarity with BIM and AutoCAD is a plus.
  • Able to work in a fast-paced environment and adapt to project demands

Apply now

Request a proposal